Does the customer really want a free estimate?

Hoist used to load an NC machine. This is what happens when operater starts the machine before unhooking the load.


chain

Switch graphic

What do you mean I need a limit switch?

This unit has been two-blocked a number of times and the operator was not aware that the hook travel must stop before striking the hoist. It appears that both the owner and operator are in need of attending the required operator training program.







Return to the top

chain

Sleave Pins graphic

We perform our own in house maintenace,
besides there is no way to reach the sheave pins.

These equalizer sheave pins came from two different crane users.
Both of these companies perform in-house maintenance on the equipment.
Like many in-house maintenance programs they tend to be reactive instead
of proactive when it comes to the overhead cranes.







chain

sinking backhoe

Did you have a bad day?

"You have to believe me boss, it was my wifes fault. She had me on the cell phone when I was backing up."









Return to the top

chain

Underfloor

Question:

Can you tell me what conduit run will be used for the crane main power feeder?


Answer:
I think so. It should be on the drawing #4536B and I think it is revision 786 or is that drawing #4638D revision 358.













chain

box fill

A world record try for conductors in a j-box?

Discovered this while tracing a feeder circuit for a monorail hoist back to the breaker panel.









Return to the top

chain

Check this out

Jake with a fish

Return to the top

Chain